Kota Tinggi Solar PV Park is a 36MW solar PV power project. It is located in Johor, Malaysia. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in August 2019.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 36 | 36 | – | Active | Johor, Malaysia | Amled Illumination M Sdn; Pengkalan Bumijaya Sdn; Zelleco Engineering Sdn |
---|
Description
The project was developed by Amled Illumination M Sdn, Pengkalan Bumijaya Sdn and Zelleco Engineering Sdn. The project is currently owned by ZEC Solar Sdn.
Kota Tinggi Solar PV Park is a ground-mounted solar project.
The project cost is $68.915m.
Development Status
The project got commissioned in August 2019.
Contractors Involved
China Machinery Engineering and Mattan Engineering Sdn were selected to render EPC services for the solar PV power project.
Teknik Janakuasa Sdn and Zelleco Engineering Sdn were contracted to render operations & maintenance services for the project.
About Zelleco Engineering Sdn
Zelleco Engineering Sdn Bhd (Zelleco), a subsidiary of Sasaran Bahagia Sdn Bhd, is an engineering company engaged in steel fabrication works. It supplies heavy electric equipment including low and medium voltage electric motors, dry transformers and automation tools. The company provides design, project management and consultancy services. Zelleco undertakes steel angles, beams, channels, plates and pipes fabrication works. It also handles project works on engineering, procurement and construction and commissioning (EPCC). The company serves power, oil and gas, telecommunication and construction industries. Zelleco is headquartered in Rawang, Selangor, Malaysia.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.