Kozienice Coal Fired Power Plant is a 2,960MW coal fired power project. It is located in Masovia, Poland. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 1972.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,960 | 2,960 | – | Active | Masovia, Poland |
---|
Description
The project is currently owned by ENEA Wytwarzanie with a stake of 100%.
It is a steam turbine power plant that is used for Baseload. The fuel is procured from Lubelski Wegiel Bogdanka S.A. mine and from Silesian mines.
Development Status
The project got commissioned in October 1972.
Contractors Involved
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit I) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit II) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit III) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit IV) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit IX) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 560MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit V) is equipped with Leningradsky Metallichesky Zavod K-5-166-2 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VI) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VII) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VIII) is equipped with GE Power 13 K 215 steam turbine. The phase consists of 1 steam turbine with 230MW nameplate capacity.
Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit X) is equipped with Leningradsky Metallichesky Zavod K-5-166-2 steam turbine. The phase consists of 1 steam turbine with 560MW nameplate capacity.
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit I).
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit II).
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit III).
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit IV).
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit IX).
Electrosila supplied TWW-500 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit V).
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VI).
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VII).
GE Power supplied TWW-200 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VIII).
Electrosila supplied TWW-500 electric generator for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit X).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit I).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit II).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit III).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit IV).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit IX).
Deutsche Babcock supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit V).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VI).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VII).
Rafako supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit VIII).
Deutsche Babcock supplied steam boiler for the Kozienice Coal Fired Power Plant (Kozienice Coal Fired Power Plant Unit X).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.