Kurtun is an 80MW hydro power project. It is located on Harsit river/basin in Gumushane, Turkey. The project is currently active. It has been developed in single phase. The project commenced construction in 1999.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 80 | 80 | – | Active | Gumushane, Turkey |
---|
Description
The project is currently owned by Devlet su Isleri Genel Mudurlugu.
The net head of the project is 83.6m. The project generated 142 GWh of electricity.
The project has 2 electric generators installed at the site.
Development Status
The project commenced construction in 1999.
Contractors Involved
Voith Hydro Holding was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.