La Jolive Solar PV Park is a 10.22MW solar PV power project. It is planned in Centre-Val de Loire, France. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2023.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 10.22 10.22 Permitting Centre-Val de Loire, France Soleia 32 SASU

Description

The project is being developed by Soleia 32 SASU and is currently owned by JP Energie Environnement.

La Jolive Solar PV Park is a ground-mounted solar project.

The project cost is expected to be around $9.351m.

Development Status

The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2023.

About Soleia 32 SASU

Soleia 32 SASU is specialized in the activity sector of electricity production. It is headquartered in France.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.