Laicheng Thermal Power Plant is a 1,200MW coal fired power project. It is located in Shandong, China. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1998 and subsequently entered into commercial operation in December 1999.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 1,200 1,200 Active Shandong, China Huadian Power International

Description

The project is developed and owned by Huadian Power International. The company has a stake of 100%.

It is a steam turbine power plant that is used for Baseload.

Development Status

The project construction commenced in 1998 and subsequently entered into commercial operation in December 1999.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Contractors Involved

PowerChina Nuclear Engineering and Shandong Electric Power Engineering Consulting Institute were selected to render EPC services for the coal fired power project.

Shanghai Electric Group was selected as the turbine supplier for the Coal fired project.

Shanghai Electric Group supplied electric generator for the project.

Shanghai Boiler Works supplied steam boiler for the project.

About Huadian Power International

Huadian Power International Corporation Ltd (HPICL), is a subsidiary of China Huadian Corp Ltd, is an electric utility. The company constructs and operates power plants, including coal- or gas-fired generating units and renewable energy projects. It operates through its plants at the electricity and heat load centers or regions with abundant coal resources. The company sells its electricity to local government owned power grid companies on point of sale basis. HPICL also has interests in various power plants under construction. It is owned by China Huadian Corporation Ltd and other shareholders in 14 provinces. HPICL is headquartered in Beijing, China.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.