Lauca is a 2,070.5MW hydro power project. It is located on Kwanza river/basin in Malanje, Angola. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2012 and subsequently entered into commercial operation in 2017.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 2,070.5 2,070.5 Active Malanje, Angola

Description

The project is currently owned by Empresa Nacional de Electricidade – E.P.

The hydro reservoir capacity is 533 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 6 in number. The penstock length is 2,000m. The project generated 8,600 GWh of electricity.

Development Status

The project construction commenced in 2012 and subsequently entered into commercial operation in 2017.

Content from our partners
Green investment: What gives Scotland multiple advantages
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration

Contractors Involved

Novonor was selected to render EPC services for the hydro power project.

Lauca (Ancillary Lauca Powerplant) is equipped with Andritz Hydro francis turbine. The phase consists of 1 turbine with 66.5MW nameplate capacity.

Lauca (Lauca Unit I, II) is equipped with Andritz Hydro francis turbines. The phase consists of 2 turbines with 334MW nameplate capacity.

Lauca (Lauca Unit III, IV) is equipped with Andritz Hydro francis turbines. The phase consists of 2 turbines with 334MW nameplate capacity.

Lauca (Lauca Unit V) is equipped with Andritz Hydro francis turbine. The phase consists of 1 turbine with 334MW nameplate capacity.

Lauca (Lauca Unit VI) is equipped with Andritz Hydro francis turbine. The phase consists of 1 turbine with 334MW nameplate capacity.

Andritz Hydro supplied 1 electric generator for the Lauca (Ancillary Lauca Powerplant). The generator capacity is 65 MVA.

Andritz Hydro supplied 2 electric generators for the Lauca (Lauca Unit I, II). The generator capacity is 334 MVA.

Andritz Hydro supplied 2 electric generators for the Lauca (Lauca Unit III, IV). The generator capacity is 334 MVA.

Andritz Hydro supplied 1 electric generator for the Lauca (Lauca Unit V). The generator capacity is 334 MVA.

Andritz Hydro supplied 1 electric generator for the Lauca (Lauca Unit VI). The generator capacity is 334 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU