Luoma is a 60MW hydro power project. It is located on Luoma river/basin in Yunnan, China. The project is currently active. It has been developed in single phase. The project construction commenced in 2007 and subsequently entered into commercial operation in 2010.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 60 | 60 | – | Active | Yunnan, China |
---|
Description
Luoma is a run-of-river project. The net head of the project is 596m. The project generated 202.045 GWh of electricity. The project cost is $61.905m.
The hydro power project consists of 2 turbines, each with 30MW nameplate capacity.
The project has 2 electric generators installed at the site.
Development Status
The project construction commenced in 2007 and subsequently entered into commercial operation in 2010.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.