Lysebotn II is a 370MW hydro power project. It is located in Rogaland, Norway. The project is currently active. It has been developed in single phase. The project construction commenced in 2014 and subsequently entered into commercial operation in 2018.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 370 370 Active Rogaland, Norway Lyse Produksjon

Description

The project is developed and owned by Lyse Produksjon.

The hydro reservoir capacity is 595 million cubic meter. The gross head of the project is 665m. The project generated 1,500 GWh of electricity. The project cost is $1,800m.

Development Status

The project construction commenced in 2014 and subsequently entered into commercial operation in 2018.

Contractors Involved

Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 185MW nameplate capacity.

Andritz Hydro supplied 2 electric generators for the project. The generator capacity is 215 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.