Mildred Lake Cogeneration Plant is a 265MW gas fired power project. It is located in Alberta, Canada. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1978.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 265 265 Active Alberta, Canada

Description

The project is currently owned by Syncrude Canada.

It is a Gas Turbine with Cogen power plant.

Development Status

The project got commissioned in 1978.

Contractors Involved

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of Frame 5 gas turbines.

GE Power supplied electric generator for the project.

Innovative Steam Technologies supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.