Mosenergo TEP-8 Power Plant is a 580MW gas fired power project. It is located in Moscow, Russia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1972.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 580 | 580 | – | Active | Moscow, Russia |
---|
Description
The project is currently owned by Mosenergo with a stake of 100%.
It is a Steam Turbine with Cogen power plant that is used for Baseload. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Fuel Oil.
The project generated 2,492,000MWh of electricity.
Development Status
The project got commissioned in December 1972.
Contractors Involved
Mosenergo TEP-8 Power Plant (Mosenergo TEP-8 Power Plant Unit I) is equipped with Leningradsky Metallichesky Zavod steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.
Mosenergo TEP-8 Power Plant (Mosenergo TEP-8 Power Plant Unit II) is equipped with Leningradsky Metallichesky Zavod steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.
Mosenergo TEP-8 Power Plant (Mosenergo TEP-8 Power Plant Unit III) is equipped with Ural Turbine Works T 110-130 steam turbine. The phase consists of 1 steam turbine with 10MW nameplate capacity.
Mosenergo TEP-8 Power Plant (Mosenergo TEP-8 Power Plant Unit IV) is equipped with Ural Turbine Works T 110-130 steam turbine. The phase consists of 1 steam turbine with 100MW nameplate capacity.
Mosenergo TEP-8 Power Plant (Mosenergo TEP-8 Power Plant Unit V) is equipped with Ural Turbine Works T 110-130 steam turbine. The phase consists of 1 steam turbine with 105MW nameplate capacity.
Mosenergo TEP-8 Power Plant (Mosenergo TEP-8 Power Plant Unit VI) is equipped with Ural Turbine Works T 110-130 steam turbine. The phase consists of 1 steam turbine with 100MW nameplate capacity.
Mosenergo TEP-8 Power Plant (Mosenergo TEP-8 Power Plant Unit VII) is equipped with Ural Turbine Works T 110-130 steam turbine. The phase consists of 1 steam turbine with 100MW nameplate capacity.
The electric generators for the project were procured from Electrosila and NPO Elsib.
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.