Mtibwa Sugar Cogeneration Plant is a 13MW biopower project. It is located in Dar es Salaam, Tanzania. The project is currently active. It has been developed in multiple phases.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 13 | 13 | – | Active | Dar es Salaam, Tanzania |
---|
Description
The process of combustion has been adopted in this combined heat and power (CHP) project to release the stored energy from the feed. Bagasse which is a kind of agricultural by-product is used as a feedstock to power the project.
Mtibwa Sugar Cogeneration Plant (Mtibwa Sugar Cogeneration Plant Phase I) consists of 1 turbine with 1.5MW nameplate capacity.
Mtibwa Sugar Cogeneration Plant (Mtibwa Sugar Cogeneration Plant Phase I) consists of 1 turbine with 2.5MW nameplate capacity.
Mtibwa Sugar Cogeneration Plant (Mtibwa Sugar Cogeneration Plant Phase II) consists of 1 turbine with 9MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.