Munteni is a 58.63MW hydro power project. It is located on Dragan river/basin in Bihor, Romania. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1988.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 58.63 58.63 Active Bihor, Romania

Description

The project is currently owned by S.C. Hidroelectrica.

Munteni is a run-of-river project.

Development Status

The project got commissioned in 1988.

Contractors Involved

Munteni (Munteni I) is equipped with UCM Resita francis turbines. The phase consists of 2 turbines with 30MW nameplate capacity.

Munteni (Munteni II) is equipped with UCM Resita francis turbine. The phase consists of 1 turbine with 0.797MW nameplate capacity.

Hydro Engineering supplied 2 electric generators for the Munteni (Munteni I). The generator capacity is 31.9 MVA.

Hydro Engineering supplied 1 electric generator for the Munteni (Munteni II). The generator capacity is 0.88 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.