Naga Waste To Energy Power Plant is a 20MW biopower project. It is planned in Bicol, Philippines. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2024.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 20 20 Permitting Bicol, Philippines CJ Global Green Energy Philippines

Description

The project is being developed and currently owned by CJ Global Green Energy Philippines.

The project cost is expected to be around $46.7m.

The process of gasification will be adopted in this project to release the stored energy from the feed.

Development Status

The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2024.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.