Nantong Coal Fired Power Plant is a 2,000MW coal fired power project. It is located in Jiangsu, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2014.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 2,000 2,000 Active Jiangsu, China

Description

The project is co-owned by China Huaneng Group and Nantong Tianshenggang Power Generation, with their respective ownership stake of 50% each.

It is a steam turbine power plant.

The project generated 10,000,000MWh of electricity. The project cost is $1,273.13m.

Development Status

The project got commissioned in 2014.

Contractors Involved

Tianjin Electric Power Construction was selected to render EPC services for the coal fired power project.

Shanghai Electric Group supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.