The US has approved two solar power plants with a combined capacity of 550MW in California and Nevada as part of President Obama’s Climate Action Plan.

The first project, called Stateline Solar Farm, will be built in San Bernardino County, California. Using photovoltaic (PV) panels, the facility will generate 300MW and create about 400 jobs during construction and 12 permanent jobs during operations.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The facility will connect to the grid via a 2.7-mile 220kV transmission line.

The second project, called Silver State South Solar, will be located near Primm, Nevada. The 250MW facility will create around 300 jobs during construction and 15 permanent operations jobs.

Both projects are proposed by First Solar and have commitments from Southern California Edison to purchase the energy produced for 20 years.

BLM principal deputy director Neil Kornze said, "These solar projects reflect exemplary cooperation between the Bureau of Land Management and other federal, state and local agencies, enabling a thorough environmental review and robust mitigation provisions."

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData
"First Solar has agreed to undertake significant project design changes and mitigation measures."

In an effort to reduce environmental impacts, First Solar has agreed to undertake significant project design changes and mitigation measures.

The project design of the Silver State South was altered to reduce the size of the facility by 100MW.

The US Secretary of the Interior Sally Jewell said, "As we implement the President’s Climate Action Plan to generate jobs, cut carbon pollution and move our economy towards clean energy sources, we need to do so in a way that takes the long view and avoids or minimises conflicts with important natural and cultural resources."

Since 2009, the US Interior Department approved 27 solar, 11 wind, and 12 geothermal projects. The latest approvals bring the total number of utility-scale renewable energy proposals and associated transmission to 50.

Defence link

Power Technology Excellence Awards - The Benefits of Entering

Gain the recognition you deserve! The Power Technology Excellence Awards celebrate innovation, leadership, and impact. By entering, you showcase your achievements, elevate your industry profile, and position yourself among top leaders driving energy industry advancements. Don’t miss your chance to stand out—submit your entry today!

Nominate Now