Nhon Hoa 2 Wind Farm is a 50MW onshore wind power project. It is located in Gia Lai, Vietnam. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2021 and subsequently entered into commercial operation in October 2021.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 50 | 50 | – | Active | Gia Lai, Vietnam | Phu Dien |
---|
Description
The project is developed and owned by Phu Dien.
The project cost is $60.306m.
Development Status
The project is currently active. The project construction commenced in 2021 and subsequently entered into commercial operation in October 2021.
Contractors Involved
Nhon Hoa 2 Wind Farm (Nhon Hoa 2 Wind Farm_Phase I) is equipped with Vestas Wind Systems V150-4.2 MW turbines. The phase consists of 10 turbines with 4.2MW nameplate capacity.
Nhon Hoa 2 Wind Farm (Nhon Hoa 2 Wind Farm_Phase II) is equipped with Vestas Wind Systems V150-4.2 MW turbines. The phase consists of 2 turbines with 4MW nameplate capacity.
Vestas Wind Systems is the O&M contractor for the wind power project for a period of 20 years.
About Phu Dien
Phu Dien JSC (Phu Dien) constructs, develops, operates and maintains photovoltaic facilities to generate electricity. The company is headquartered in Vietnam.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.