Novosibirsk TPP-2 is a 345MW coal fired power project. It is located in Novosibirsk, Russia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 1935.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 345 345 Active Novosibirsk, Russia

Description

The project is currently owned by Siberian Generating with a stake of 100%.

It is a Steam Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is coal. In case of shortage of coal the plant can also run on Natural gas. The fuel is procured from Kuznetsk Coal, Kansk-Achinsk Coal.

Development Status

The project got commissioned in November 1935.

Contractors Involved

Novosibirsk TPP-2 (Novosibirsk TPP-2 Unit I) is equipped with Bryansky Mashinostroitelny Zavod T-20-90 steam turbine. The phase consists of 1 steam turbine with 20MW nameplate capacity.

Novosibirsk TPP-2 (Novosibirsk TPP-2 Unit II) is equipped with Bryansky Mashinostroitelny Zavod T-20-90 steam turbine. The phase consists of 1 steam turbine with 20MW nameplate capacity.

Novosibirsk TPP-2 (Novosibirsk TPP-2 Unit III) is equipped with Bryansky Mashinostroitelny Zavod T-20-90 steam turbine. The phase consists of 1 steam turbine with 20MW nameplate capacity.

Novosibirsk TPP-2 (Novosibirsk TPP-2 Unit IV) is equipped with Leningradsky Metallichesky Zavod PT- 60 steam turbine. The phase consists of 1 steam turbine with 65MW nameplate capacity.

Novosibirsk TPP-2 (Novosibirsk TPP-2 Unit V) is equipped with Leningradsky Metallichesky Zavod steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Novosibirsk TPP-2 (Novosibirsk TPP-2 Unit VI) is equipped with Leningradsky Metallichesky Zavod PT-80-130 steam turbine. The phase consists of 1 steam turbine with 80MW nameplate capacity.

Novosibirsk TPP-2 (Novosibirsk TPP-2 Unit VII) is equipped with Leningradsky Metallichesky Zavod PT-80-130 steam turbine. The phase consists of 1 steam turbine with 80MW nameplate capacity.

NPO Elsib supplied TF–63–2U3, Air cooled electric generator for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.