The Ostroleka Combined Cycle Power Plant is 750MW gas fired power project. It is planned in Masovia, Poland. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2025.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 750 | – | 750 | Permitting | Masovia, Poland | Polski Koncern Naftowy Orlen; Polskie Gornictwo Naftowe i Gazownictwo |
---|
Description
The project is being developed and currently owned by Polski Koncern Naftowy Orlen and Polskie Gornictwo Naftowe i Gazownictwo. The company’s ownership stake in the project stands as 49% respectively.
It is a combined cycle gas turbine (ccgt) power plant. The fuel will be procured from Klaipeda LNG FSRU.
The project cost is expected to be around $650m.
The Gas fired project consists of 1 gas turbine.
The Gas fired project consists of 1 steam turbine.
Development Status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2025.
Contractors Involved
GE Power is expected to render EPC services for the gas fired power project.
About Polski Koncern Naftowy Orlen
Polski Koncern Naftowy Orlen SA (PKN Orlen) is an integrated oil and gas company. It explores for and produces crude oil and natural gas; manufactures petroleum products; markets natural gas and natural gas liquids; and transports and sells crude oil and petroleum products. Its product portfolio includes medium distillates, light distillates, heavy fractions, monomers, polymers, purified terephthalic acid (PTA), plastics, fertilizers and aromas, liquid hydrocarbons and natural gas, among others. The company also has upstream oil and gas operations in Canada and Poland. It has operational presence in Poland, Germany, Czech Republic, Lithuania, Latvia, Estonia, Malta, Sweden, the Netherlands, Slovakia, Hungary, the US and Canada. PKN Orlen is headquartered in Plock, Poland.
About Polskie Gornictwo Naftowe i Gazownictwo
Polskie Gornictwo Naftowe i Gazownictwo SA (PGNiG) is a vertically integrated gas company. It carries out domestic natural gas and crude oil production, development of natural gas and crude oil fields, provision of geological, geophysical and exploration services in Poland and abroad, import of natural gas to Poland, storage of natural gas in underground storage facilities, and distribution of gaseous fuels. PGNiG also produces heat and electricity, distributes heat, and executes large natural gas-fired projects. The company carries out operations in Poland, Pakistan, Norway, Russia, Belgium, Belarus, and Ukraine through its subsidiaries and branches. PGNiG is headquartered in Warsaw, Poland.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.