Oulun Biomass Power Plant is a 47.9MW biopower project. It is located in Northern Ostrobothnia, Finland. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in August 2012.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 47.9 47.9 Active Northern Ostrobothnia, Finland

Description

Kemira and Oulun Energia Siirto ja Jakelu are currently owning the project.

The project cost is $323.207m.

The process of combustion has been adopted in this combined heat and power (CHP) project to release the stored energy from the feed. Industrial waste and municipal solid waste are used as a feedstock to power the project.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project got commissioned in August 2012.

Contractors Involved

Baumgarte Boiler Systems supplied steam boiler for the project. The temperature witnessed inside the boiler is around 425Degree Celsius. The steam is pressurized inside the boiler at 87bar.Baumgarte Boiler Systems supplied the electric generator for the project.

Laanilan Voima is the O&M contractor for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.