Pedro Camejo Power Plant is a 300MW gas fired power project. It is located in Carabobo, Venezuela. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2006.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 300 300 Active Carabobo, Venezuela

Description

The project is currently owned by Corporacion Electrica Nacional with a stake of 100%.

It is a Gas Turbine power plant that is used for Baseload. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel.

The project generated 2,206,630MWh of electricity. The project cost is $387.45m.

Development Status

The project got commissioned in March 2006.

Contractors Involved

Siemens was selected as the turbine supplier for the Gas fired project. The company provided 2 units of SGT6-5000F gas turbines, each with 150MW nameplate capacity.

Siemens supplied electric generator for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.