Penaflor IV is a 48.99MW onshore wind power project. It is located in Castile and León, Spain. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2012.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 48.99 | 48.99 | – | Active | Castile and León, Spain | Bionor Transformacion |
---|
Description
The project was developed by Bionor Transformacion and is currently owned by Iberdrola with a stake of 100%.
Development Status
The project is currently active. The project got commissioned in 2012.
Contractors Involved
Penaflor IV (Penaflor IV A) is equipped with GE Renewable Energy ECO 80 turbines. The phase consists of 27 turbines with 1.67MW nameplate capacity.
Penaflor IV (Penaflor IV B) is equipped with GE Renewable Energy ECO 62 turbines. The phase consists of 3 turbines with 1.3MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.