Pine Flat is a 165MW hydro power project. It is located on Kings river/basin in California, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1984.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 165 165 Active California, the US

Description

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The project is currently owned by Kings River Conservation District with a stake of 100%.

The hydro reservoir capacity is 1,233.48 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 3 in number. The penstock diameter is 4.115m. The project generated 420 GWh of electricity.

The hydro power project consists of 3 turbines, each with 55MW nameplate capacity.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project got commissioned in 1984.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.