Upper Mugu Karnali is a 306MW hydro power project. It is planned on Mugu Karnali Nadi river/basin in Karnali, Nepal. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2029 and is expected to enter into commercial operation in 2032. Buy the profile here.
Description
The project is being developed and currently owned by Elevate Energy.
Upper Mugu Karnali is a run-of-river project. The gross head of the project will be 420.35m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 1 in number. The penstock length will be 2,289m. The penstock diameter will be 4.3m.
The hydro power project consists of 4 units of francis turbines.
Development status
The project construction is expected to commence from 2029. Subsequent to that it will enter into commercial operation by 2032.
For more details on Upper Mugu Karnali, buy the profile here.
About Elevate Energy
Elevate Energy Pvt Ltd, a subsidiary of Golyan Group, is engaged in production and construction of hydropower plant that provides project management, engineering consulting and other related services. The company is headquartered in Mugu, Karnali, Nepal.