Reftinskaya GRES, Russia

By Carmen

Reftinskaya GRES is a 3,800MW coal fired power project. It is located in Sverdlovsk, Russia. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1963 and subsequently entered into commercial operation in December 1970.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 3,800 3,800 Active Sverdlovsk, Russia

Description

The project is currently owned by Kuzbassenergo with a stake of 100%.

It is a steam turbine with cogen power plant. The fuel is procured from ekibastuz deposit (kazakhstan).

The project generated 22,002,000MWh of electricity.

Development Status

The project construction commenced in 1963 and subsequently entered into commercial operation in December 1970.

Contractors Involved

Reftinskaya GRES (Reftinskaya GRES Unit I) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit II) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit III) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit IV) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit IX) is equipped with Turboatom K-500-240 steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit V) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit VI) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit VII) is equipped with Turboatom K-500-240 steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit VIII) is equipped with Turboatom K-500-240 steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Reftinskaya GRES (Reftinskaya GRES Unit X) is equipped with Turboatom K-500-240 steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Electrotyazhmash supplied TGW -300 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit I).

Electrotyazhmash supplied TGW -300 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit II).

Electrotyazhmash supplied TGW -300 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit III).

Electrotyazhmash supplied TGW -300 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit IV).

Electrotyazhmash supplied TVM-500 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit IX).

Electrotyazhmash supplied TGW -300 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit V).

Electrotyazhmash supplied TGW -300 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit VI).

Electrotyazhmash supplied TGW -300 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit VII).

Electrotyazhmash supplied TVM-500 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit VIII).

Electrotyazhmash supplied TVM-500 electric generator for the Reftinskaya GRES (Reftinskaya GRES Unit X).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU

Thank you for subscribing to Power Technology