Richland Peaking Power Plant is a 450MW gas fired power project. It is located in Ohio, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1965.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 450 450 Active Ohio, the US

Description

The project is currently owned by Luminant Generation with a stake of 100%.

It is a Gas Turbine power plant that is used for Peakload. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil. The fuel is procured from Panhandle Eastern Pipeline Company.

The project generated 95,000MWh of electricity.

Development Status

The project got commissioned in December 1965.

Contractors Involved

Gemma Power Systems was selected to render EPC services for the Richland Peaking Power Plant (Richland Peaking Power Plant Unit IV) project. Gemma Power Systems was selected to render EPC services for the Richland Peaking Power Plant (Richland Peaking Power Plant Unit V) project. Gemma Power Systems was selected to render EPC services for the Richland Peaking Power Plant (Richland Peaking Power Plant Unit VI) project.

Richland Peaking Power Plant (Richland Peaking Power Plant Unit I) is equipped with GE Power Frame 5 gas turbine. The phase consists of 1 gas turbine with 15MW nameplate capacity.

Richland Peaking Power Plant (Richland Peaking Power Plant Unit II) is equipped with GE Power Frame 5 gas turbine. The phase consists of 1 gas turbine with 15MW nameplate capacity.

Richland Peaking Power Plant (Richland Peaking Power Plant Unit III) is equipped with GE Power Frame 5 gas turbine. The phase consists of 1 gas turbine with 15MW nameplate capacity.

Richland Peaking Power Plant (Richland Peaking Power Plant Unit IV) is equipped with GE Power GT11N2 gas turbine. The phase consists of 1 gas turbine with 135MW nameplate capacity.

Richland Peaking Power Plant (Richland Peaking Power Plant Unit V) is equipped with GE Power GT11N2 gas turbine. The phase consists of 1 gas turbine with 135MW nameplate capacity.

Richland Peaking Power Plant (Richland Peaking Power Plant Unit VI) is equipped with GE Power GT11N2 gas turbine. The phase consists of 1 gas turbine with 135MW nameplate capacity.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU

Thank you for subscribing to Power Technology