Sand Hill Combined Cycle Power Plant is a 388MW gas fired power project. It is located in Texas, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in September 2004.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 388 | 388 | – | Active | Texas, the US |
---|
Description
The project is currently owned by Austin Energy.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from Enterprise, Atmos, Kinder Morgan.
The project generated 907,620MWh of electricity.
Development Status
The project got commissioned in September 2004.
Contractors Involved
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of 7F.04 gas turbine with 198MW nameplate capacity.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of D11 steam turbine with 190MW nameplate capacity.
GE Power supplied electric generator for the project.
Doosan Heavy Industries & Construction supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.