Seagull Cogeneration Plant is a 250MW coal fired power project. It is located in North Jeolla, South Korea. The project is currently active. It has been developed in single phase. The project construction commenced in 2013 and subsequently entered into commercial operation in May 2016.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 250 250 Active North Jeolla, South Korea

Description

The project is currently owned by Gunjang Energy.

It is a Steam Turbine with Cogen power plant.

The project cost is $463.925m.

Development Status

The project construction commenced in 2013 and subsequently entered into commercial operation in May 2016.

Contractors Involved

SGC eTEC E&C was selected to render EPC services for the coal fired power project.

Siemens was selected as the turbine supplier for the Coal fired project. The company supplied SST-500 model steam turbines for the project.

Siemens was selected as the turbine supplier for the Coal fired project. The company supplied SST-800 model steam turbines for the project.

Siemens supplied SGen6-100A electric generator for the project.

Sumitomo SHI FW Energia supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.