The Seraing Combined Cycle Power Plant New is 870MW gas fired power project. It is planned in Liege, Belgium. The project is currently in announced stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2025.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 870 | – | 870 | Announced | Liege, Belgium | Luminus |
---|
Description
The project is being developed and currently owned by Luminus. The company has a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant.
The project cost is expected to be around $943.95m.
Development Status
The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2025.
About Luminus
Luminus SA (Luminus) formerly known as EDF Luminus SA , a subsidiary of Electricite de France SA, is an energy utility. It produces electricity and supplies energy and gas, and provides energy products, and efficiency and saving and other related services. It develop and produce green energy, operating onshore wind farms and hydro-electric power stations. The company generates power using natural gas, hydro, solar and wind sources. EDF Luminus also has a 50% stake in unit 1 of the Tihange power plant. Under Luminus brand, it markets its offerings. The company serves residential, commercial and industrial customers in the country. Luminus is headquartered in Brussels, Belgium.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.