Seyitali RES is a 36MW onshore wind power project. It is located in Izmir, Turkey. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2011.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 36 | 36 | – | Active | Izmir, Turkey | Doruk Enerji Elektrik Uretim |
---|
Description
The project was developed by Doruk Enerji Elektrik Uretim. The project is co-owned by Demirer Enerji Uretim and Polat Enerji Sanayi ve Ticaret, with their respective ownership stake of 50% each.
The electricitiy generated from the plant has offsetted 60,000t of carbon dioxide emissions (CO2) a year.
Development Status
The project is currently active. The project got commissioned in July 2011.
Contractors Involved
Seyitali RES (Seyitali RES I) is equipped with Enercon E-70 turbines. The phase consists of 15 turbines with 2MW nameplate capacity.
Seyitali RES (Seyitali RES II) is equipped with Enercon E-70 turbine. The phase consists of 1 turbine with 2MW nameplate capacity.
Seyitali RES (Seyitali RES III) is equipped with Enercon turbines. The phase consists of 2 turbines, each with 2MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.