Shaanxi Baoji No.2 Power Plant, China

By Carmen

Shaanxi Baoji No.2 Power Plant is a 2,920MW coal fired power project. It is located in Shaanxi, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1998.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 2,920 2,520 Active Shaanxi, China

Description

The project is currently owned by China Energy Investment with a stake of 100%.

It is a steam turbine power plant that is used for Baseload.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Expansion) consists of 2 steam turbines with 200MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit II) consists of 1 steam turbine with 660MW nameplate capacity.

Content from our partners
Green investment: What gives Scotland multiple advantages
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration

Development Status

The project got commissioned in December 1998.

Contractors Involved

Northwest Electric Power Design Institute was selected to render EPC services for the coal fired power project.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit I) is equipped with Dongfang Turbine N300-16.7/537/537-4 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit II) is equipped with Dongfang Turbine N300-16.7/537/537-4 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit III) is equipped with Dongfang Turbine N300-16.7/537/537-5 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit IV) is equipped with Dongfang Turbine N300-16.7/537/537-5 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit I) is equipped with Shanghai Steam Turbine NJK660-24.2 / 566/566 steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit I).

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit II).

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit III).

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit IV).

Shanghai Electrical Machinery Group supplied QFSN-660-2 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit I).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit I).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit II).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit III).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit IV).

Shanghai Boiler Works supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit I).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU