Shin-Aoyama Highland Wind Power Station is an 80MW onshore wind power project. It is located in Mie, Japan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in March 2016.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 80 | 80 | – | Active | Mie, Japan | Aoyama Kogen Wind Farm; C-Tech |
---|
Description
The project was developed by Aoyama Kogen Wind Farm and C-Tech. The project is currently owned by C-Tech with a stake of 95.8%.
The project supplies enough clean energy to power 44,000 households, offsetting 74,000t of carbon dioxide emissions (CO2) a year.
The project has 65.4m high towers.
Development Status
The project is currently active. The project got commissioned in March 2016.
Contractors Involved
Hitachi was selected as the turbine supplier for the wind power project. The project consists of 40 units of HTW 2.0 – 80 turbines, each with 2MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.