Shintsubakihara is a 63.1MW hydro power project. It is located on Sho river/basin in Gifu, Japan. The project is currently active. It has been developed in single phase. The project construction commenced in 1952 and subsequently entered into commercial operation in 1975.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 63.1 | 63.1 | – | Active | Gifu, Japan |
---|
Description
The project is currently owned by The Kansai Electric Power.
The hydro reservoir capacity is 22.27 million cubic meter. The net head of the project is 62m.
The hydro power project consists of 1 turbine with 65MW nameplate capacity.
The project has 1 electric generator installed at the site.
Development Status
The project construction commenced in 1952 and subsequently entered into commercial operation in 1975.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.