Sierra Costera I Wind Project is a 46.65MW onshore wind power project. It is located in Aragon, Spain. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2019.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 46.65 46.65 Active Aragon, Spain Enel Green Power Espana SLU

Description

The project is developed and owned by Enel Green Power Espana SLU.

The project generates 141GWh electricity thereby offsetting 93,000t of carbon dioxide emissions (CO2) a year. The project cost is $49.941m.

The wind power project consists of 11 turbines each with 3.3 MW nameplate capacity and 3 turbines each with 3.45 MW nameplate capacity respectively.

Development Status

The project is currently active. The project got commissioned in October 2019.

Contractors Involved

SARPEL Ingenieria was selected to render EPC services for the wind power project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.