Slave Falls is a 67MW hydro power project. It is located on Winnipeg river/basin in Manitoba, Canada. The project is currently active. It has been developed in single phase. The project construction commenced in 1928 and subsequently entered into commercial operation in 1931.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 67 | 67 | – | Active | Manitoba, Canada | Winnipeg Hydro |
---|
Description
The project was developed by Winnipeg Hydro and is currently owned by Manitoba Hydro-Electric Board.
Slave Falls is a run-of-river project. The net head of the project is 9.75m. The project generated 499 GWh of electricity. The project cost is $8.3m.
Development Status
The project construction commenced in 1928 and subsequently entered into commercial operation in 1931.
Contractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 4 units of propeller turbines, each with 9MW nameplate capacity.
The electric generators for the project were procured from Andritz Hydro and GE Renewable Energy.
About Winnipeg Hydro
Winnipeg Hydro is engaged in hydro power generation, transmission and distribution in Winnipeg. The company serves 95,000 customers in the city of Winnipeg of which approximately 84,000 are residential customers and other 11,000 are business customers.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.