Sopladora is a 487.8MW hydro power project. It is located on Paute river/basin in Azuay, Ecuador. The project is currently active. It has been developed in single phase. The project construction commenced in 2011 and subsequently entered into commercial operation in 2016.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 487.8 487.8 Active Azuay, Ecuador Fopeca Ecuador

Description

The project was developed by Fopeca Ecuador and is currently owned by Hidropaute.

Sopladora is a run-of-river project. The gross head and net head of the project are 385.52m and 362.56m respectively. The project generated 2,806.78 GWh of electricity. The project cost is $800m.

Development Status

The project construction commenced in 2011 and subsequently entered into commercial operation in 2016.

Contractors Involved

China Gezhouba Group was selected to render EPC services for the hydro power project.

China Gezhouba Group was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 162.6MW nameplate capacity.

China Gezhouba Group supplied 3 electric generators for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.