Sujiawan Power Plant is a 300MW coal fired power project. It is located in Hubei, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in January 1999.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 300 | 300 | – | Active | Hubei, China |
---|
Description
The project is currently owned by China Huaneng Group.
It is a Steam Turbine power plant that is used for Baseload.
Development Status
The project got commissioned in January 1999.
Contractors Involved
Hunan Lingling Hengyuan Power Equipment was selected as the turbine supplier for the Coal fired project. The company supplied CJA237-W-120/1×9 Steam Turbine model steam turbines for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.