Sultan Iskandar Combined Cycle Power Plant is a 269.6MW gas fired power project. It is located in Johor, Malaysia. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in July 1996.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 269.6 | 269.6 | – | Active | Johor, Malaysia |
---|
Description
The project is currently owned by Tenaga Nasional with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil.
Development Status
The project got commissioned in July 1996.
Contractors Involved
The Gas fired project have been supplied by GE Power and Mitsubishi Power.
GE Power supplied electric generator for the project.
GE Power supplied electric generator for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.