Sumitomo Miyazaki Biomass Power Plant is a 14MW biopower project. It is located in Miyazaki, Japan. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2006.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 14 14 Active Miyazaki, Japan

Description

The project is currently owned by Sumitomo Heavy Industries.

The project cost is $63.248m.

Agricultural by-product and animal waste are used as a feedstock to power the project.

Development Status

The project got commissioned in 2006.

Contractors Involved

Amec Foster Wheeler supplied steam boiler for the project. The boiler installed at the site has a capacity of 60TPH.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.