Tehkhand Waste Energy Power Project is a 25MW biopower project. It is planned in NCT, India. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2024.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 25 25 Permitting NCT, India Tehkhand Waste to Electricity Project

Description

The project is being developed and currently owned by Tehkhand Waste to Electricity Project.

The project cost is expected to be around $36.146m.

Refuse which is a kind of municipal solid waste will be used as a feedstock to power the project.

Development Status

The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2024.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.