Telessio-Eugio-Rosone is an 82.4MW hydro power project. It is located on Piantonetto, Eugio river/basin in Piedmont, Italy. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1959.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 82.4 | 82.4 | – | Active | Piedmont, Italy |
---|
Description
The project is currently owned by Iren Energia.
Telessio-Eugio-Rosone is a reservoir based project. The hydro reservoir capacity is 23 million cubic meter. The gross head of the project is 1,217m. Telessio-Eugio-Rosone underwent through rehabilitation & modernization during 2010. The project generated 200 GWh of electricity.
The nameplate capacity of electric generator(s) installed at the site is 50 MVA.
Development Status
The project got commissioned in 1959.
Contractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 2 units of pelton turbines, each with 41.2MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.