The Thorpe Marsh Combined Cycle Power Plant is 1,575MW gas fired power project. It is planned in England, the UK. The project is currently in permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2023.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,575 | – | 1,575 | Permitting | England, the UK | Thorpe Marsh Power |
---|
Description
The project is being developed by Thorpe Marsh Power. Acorn Power Development (UK) and Carlton Power are currently owning the project.
It is a combined cycle gas turbine (ccgt) power plant. The fuel will be procured from Thorpe Marsh Pipeline.
Development Status
The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2023.
Contractors Involved
GE Power will be the turbine supplier for the Gas fired project.
GE Power will be the turbine supplier for the Gas fired project. The company is expected to provide 2 units of 9HA.01 gas turbines.
GE Power is expected to be the supplier electric generator for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.