The Tioga County Combined Cycle Power Project is 644.3MW gas fired power project. It is planned in New York, the US. The project is currently in permitting stage. It will be developed in single phase. Post completion of the construction, the project is expected to get commissioned in 2021.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 644.3 | – | 644.3 | Permitting | New York, the US | ESC Tioga County Power |
---|
Description
The project is being developed and currently owned by ESC Tioga County Power.
It is a combined cycle gas turbine (ccgt) power plant.
The project cost is expected to be around $897.768m.
The Gas fired project consists of 2 gas turbines.
The Gas fired project consists of 1 steam turbine.
Development Status
Post completion of the construction, the project is expected to get commissioned in 2021.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.