Tjorhom is a 120MW hydro power project. It is located on Sira river/basin in Agder, Norway. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1973.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 120 | 120 | – | Active | Agder, Norway |
---|
Description
Lyse Produksjon, Statkraft, Skagerrak Energi and Agder Energi are currently owning the project having ownership stake of 41.1%, 32.1%, 14.6% and 12.2% respectively.
The gross head of the project is 158m. The project generated 509 GWh of electricity.
The hydro power project consists of 2 turbines, each with 60MW nameplate capacity.
The project has 2 electric generators installed at the site. The generator capacity is 70 MVA.
Development Status
The project got commissioned in 1973.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.