Topolog Dorobantu wind power plant is an 84MW onshore wind power project. It is located in Tulcea, Romania. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in January 2014.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 84 84 Active Tulcea, Romania LUKErg Renew

Description

The project is developed and owned by LUKErg Renew.

The project generates 200,000MWh electricity and supplies enough clean energy to power 60,000 households, offsetting 110,000t of carbon dioxide emissions (CO2) a year. The project cost is $183.95m.

Development Status

The project is currently active. The project got commissioned in January 2014.

Contractors Involved

Vestas Wind Systems was selected as the turbine supplier for the wind power project. The project consists of 42 units of V90-2.0 MW turbines, each with 2MW nameplate capacity.

Vestas Wind Systems is the O&M contractor for the wind power project for a period of 15 years.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.