Vasilikos Power Plant Phase I & II is a 390MW oil fired power project. It is located in Larnaca, Cyprus. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2000.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 390 390 Active Larnaca, Cyprus

Description

The project is currently owned by Electricity Authority of Cyprus.

It is a Steam Turbine power plant that is used for Baseload.

Vasilikos Power Plant Phase I & II (Vasilikos Power Plant Phase I & II Unit 3) consists of 1 steam turbine.

Development Status

The project got commissioned in 2000.

Contractors Involved

Vasilikos Power Plant Phase I & II (Vasilikos Power Plant Phase I & II Unit 1 & 2) is equipped with ABB Asea Brown Boveri steam turbines. The Oil fired phase consists 2 steam turbines.

Austrian Energy & Environment (Australia) supplied steam boiler for the Vasilikos Power Plant Phase I & II (Vasilikos Power Plant Phase I & II Unit 1 & 2).

AC Boilers supplied steam boiler for the Vasilikos Power Plant Phase I & II (Vasilikos Power Plant Phase I & II Unit 3).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.