Vasteras Biomass Power Plant is a 50MW biopower project. It is located in Vastmanland, Sweden. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 50 | 50 | – | Active | Vastmanland, Sweden |
---|
Description
The project is currently owned by Malarenergi.
The electricitiy generated from the plant has offsetted 300,000t of carbon dioxide emissions (CO2) a year. The project cost is $202.819m.
Vasteras Biomass Power Plant is a combined heat and power (CHP) project. Industrial waste and municipal solid waste are used as a feedstock to power the project.
Development Status

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe project got commissioned in 2014.
Contractors Involved
Siemens was selected as the steam turbine supplier for the project.
Neles supplied steam boiler for the project. The boiler installed at the site has a capacity of 60TPH. The temperature witnessed inside the boiler is around 470Degree Celsius. The steam is pressurized inside the boiler at 75.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.