Walter F George is a 130MW hydro power project. It is located on Chattahoochee river/basin in Alabama, the US. The project is currently active. It has been developed in single phase. The project construction commenced in 1955 and subsequently entered into commercial operation in 1963.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 130 | 130 | – | Active | Alabama, the US | US Army Corps of Engineers |
---|
Description
The project is developed and owned by US Army Corps of Engineers. The company has a stake of 100%.
Walter F George is a reservoir based project. The hydro reservoir capacity is 1,151.88 million cubic meter.
Development Status
The project construction commenced in 1955 and subsequently entered into commercial operation in 1963.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 4 units of kaplan turbines, each with 32.5MW nameplate capacity.
Elliott Energy Systems supplied 4 electric generators for the project. The generator capacity is 36.11 MVA.
About US Army Corps of Engineers
US Army Corps of Engineers (UACE) is an American federal agency. The agency offers engineering services to civilians, soldiers and citizens. It research and develops technology for war fighters. UACE dredges America’s waterways to support the movement of critical commodities and provides recreation facilities at campgrounds, lakes and marinas. The agency reduces risks from disasters through devising hurricane and storm damage reduction infrastructure. It also offers cleaning services for sites contaminated with hazardous, toxic or radioactive waste and materials. UACE is headquartered in Washington, the US.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.