Waterford 3 is a 1,250MW nuclear reactor which is located within the premises of Waterford Nuclear Power Station. It is located in Louisiana, the US. The nuclear reactor is currently generating power and is in active status. The construction on the reactor commenced in Nov, 1974. The first power from the reactor was achieved in Mar, 1985. Subsequent to trial runs the reactor finally entered into commercial operation in Sep, 1985.

PID Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Main Contractor
1178 Nuclear 1,250 1,250 Active Louisiana, the US Combustion Engineering

Description

Waterford 3 is a Generation II nuclear reactor developed by Combustion Engineering, the main contractor for the project.

The 1,250MW reactor is currently owned by Entergy Louisiana (100%) and operated by Entergy Nuclear.

The PWR reactor generates 7,560.4GWh/annum of electricity. It features 217 fuel assemblies in the core of reactor, the place where fission occurs and energy is released. Safety contol rods that are used to control the fission rate in the reactor are 42 in number. The project cost is $2,800m.

Development Status

Content from our partners
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration
Reimagining the carbon problem

The reactor construction commenced in Nov, 1974 and subsequently entered into commercial operation in Sep, 1985.

Contractors Involved

Westinghouse Electric was selected as the steam turbine supplier for the nuclear reactor. The company provided 1 steam turbine for the project. Ebasco was selected as an architect engineer for the reactor. The reactor system was supplied by Combustion Engineering. The reactor vessel has been supplied by Combustion Engineering. The material used for the construction of the vessel is Alloyed Steel (SA 533). The civil works were carried out by Ebasco.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU