Wildegg-Brugg is a 50MW hydro power project. It is located on Aare river/basin in Aargau, Switzerland. The project is currently active. It has been developed in single phase. The project construction commenced in 1949 and subsequently entered into commercial operation in 1952.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 50 | 50 | – | Active | Aargau, Switzerland |
---|
Description
The project is currently owned by Axpo Power with a stake of 100%.
Wildegg-Brugg is a run-of-river project. The project generated 300 GWh of electricity.
The hydro power project consists of 2 turbines, each with 25MW nameplate capacity.
Development Status
The project construction commenced in 1949 and subsequently entered into commercial operation in 1952.
Contractors Involved
ABB supplied 2 electric generators for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.