Windpark Drohndorf is a 54MW onshore wind power project. It is located in Saxony-Anhalt, Germany. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2017.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 54 54 Active Saxony-Anhalt, Germany

Development Status

The project is currently active. The project got commissioned in December 2017.

Contractors Involved

Windpark Drohndorf (Windpark Drohndorf – Phase I) is equipped with Vensys Energy VENSYS 120-3 MW turbines. The phase consists of 4 turbines with 3MW nameplate capacity.

Windpark Drohndorf (Windpark Drohndorf – Phase II) is equipped with Vensys Energy 136/3500 turbines. The phase consists of 12 turbines with 3.5MW nameplate capacity.

The Windpark Drohndorf (Windpark Drohndorf – Phase I), consists of Hybrid towers supplied by Max Bogl Wind. These towers are around 140.00m high.

The Windpark Drohndorf (Windpark Drohndorf – Phase II), consists of Hybrid towers supplied by Max Bogl Wind. These towers are around 132.00m high.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.